What has come up most since our units went on the market, and how it lines up with where the industry is heading.
Grid Rig units have been on the market for almost a year. In that time we've spoken with mining and construction contractors, transport and bus operators, land managers, engineers, hire companies and event organisers, among others.
Some things have come up again and again. We're a small company and wouldn't claim our conversations represent the whole market, but each of the trends below also appears in the public data.
Remote sites bring the clearest briefs
The most specific requests we get come from the furthest away: island communities, outstations, remote transport routes and even projects in the Pacific. These operators tend to know exactly what they need, often down to how a unit will physically reach them. Where the standard range doesn't suit a particular weight limit or a transport method, the conversation turns to a custom build.
The economics explain why. Power and Water's Indigenous Essential Services burns around 25 million litres of diesel a year powering remote communities in the Northern Territory, and diesel on the APY Lands reached $3.90 a litre against $2.39 in Adelaide this year. At those prices, a battery charged from solar wins on cost well before emissions enter the conversation.

People want power as much as charging
We didn't see this one coming. The industrial power outputs on our units were meant to let a site run tools alongside vehicle charging. They've become a reason in their own right for people to get in touch.
Builders want extra capacity for sites whose temporary supply is already maxed out. Facilities want backup power. Equipment suppliers want a way to run electric equipment on sites that have nothing to plug into. In those conversations, vehicle charging barely comes up.
Construction is moving the same way. CPB Contractors fitted a 123 kilowatt-hour solar and battery system to a HumeLink site and cut diesel generation to one hour a day. A METRONET site in Perth that could not be grid-connected ran on a solar and battery hybrid and saved around 45,000 litres of diesel.
Bus depots sit somewhere in between. They still need charging, but operators want to know what happens when the grid can't deliver. In Canberra, the Belconnen depot can't be upgraded for electric buses because of limits on available power across the whole precinct.

Most fleets are starting small
Almost nobody we speak to is electrifying everything at once. The usual plan is a couple of vehicles now and heavier ones in a few years, and people usually ask about our smaller units first.
The national figures show the same gap. In August, battery electric vehicles reached 24.9 per cent of new vehicle sales, outselling every other powertrain for the first time. Electric models made up just 0.9 per cent of trucks and heavy vans sold earlier this year.
This favours a unit that can be relocated, paired with a second one or recharged from mains or solar as the site grows, rather than infrastructure that’s built once for a fixed load.

Highways keep coming up
We hear regularly from operators interested in roadside rescue for EVs that have run flat between towns, and from people looking at charging along freight corridors.
RACV says EV out-of-charge callouts have risen by more than 50 per cent a year on average since 2023. For heavy vehicles, the first intercity truck charging hubs are only now breaking ground, and none is open between capital cities yet. We covered the heavy vehicle side in our piece on Australia's electric prime mover trials.
A Grid Rig unit isn't a highway charging hub. A trailer-mounted unit can, though, put range back into a stranded car, and that's what a regional recovery operator needs to build a service around.
Hire businesses want units to hire out
We've also heard from businesses that want units to hire out for construction, events and temporary sites.
That matches the wider hire market. Kennards Hire already carries battery units and says customers have reported diesel reductions of up to 70 per cent on construction sites. Diesel isn't going anywhere quickly, though. Coates is tripling its large-capacity generator fleet to meet mining demand, and hire fleets will carry both for some time yet.

How we build for the industry
What we've heard from across multiple industries all points one way. Operators want power they can get to the site, however remote, that’s sized for the fleet they have now, and is easy to add to or move as that changes. That's what Grid Rig was built for, and these conversations have sharpened our focus on site power and on smaller units for operators who are starting out with battery energy.
Our range of mobile BESS units runs from 103 kilowatt-hours to two megawatt-hours, with DC fast charging and industrial power outputs on the same unit. Every model can be upgraded to mine and industrial specification, and where the standard range doesn't fit a site, a weight limit or a transport method, we build to the client's specifications. Every unit carries AS3000 Part One compliance certification and is backed by service level agreements and licensed commissioning through our sister company Vantage West.
If any of this sounds like your situation, talk to our team. Start by telling us your needs and constraints, and we'll work from there.